News:

Rule #1 - Be Patient - Rule #2 - Don't ask when, if you don't contribute - Rule #3 - You have coding skills - LinuxMCE's small brother is available: http://www.agocontrol.com

Main Menu

Z-Wave?

Started by jwarder, January 01, 2009, 09:55:23 PM

Previous topic - Next topic

jwarder

Hi,

I am just setting up LMCE in my office as a bit of a trial, I want to contol the lights in my office which are 3 ceiling spotlights High-Voltage (240v) controled by one switch, What do I need to buy as I have no idea, and how difficult to setup, and any approx cost?

Cheers,
Jack

hari

i would recommend the merten connect dimmer or in-wall switch and a MCV usb dongle. What exact type of load is that?

br, Hari
rock your home - [url="http://www.agocontrol.com"]http://www.agocontrol.com[/url] home automation

jwarder

Quote from: hari on January 01, 2009, 10:33:16 PM
i would recommend the merten connect dimmer or in-wall switch and a MCV usb dongle. What exact type of load is that?

br, Hari

Ok thanks, i'm no too sure on the load i'll have to check, where can I buy both these products from?

Cheers,
Jack

hari

Quote from: jwarder on January 01, 2009, 11:00:33 PM
Quote from: hari on January 01, 2009, 10:33:16 PM
i would recommend the merten connect dimmer or in-wall switch and a MCV usb dongle. What exact type of load is that?

br, Hari

Ok thanks, i'm no too sure on the load i'll have to check, where can I buy both these products from?

Cheers,
Jack
look at the wiki..

br
rock your home - [url="http://www.agocontrol.com"]http://www.agocontrol.com[/url] home automation

hari

rock your home - [url="http://www.agocontrol.com"]http://www.agocontrol.com[/url] home automation